background

Bespoke tube section made to drawing

08 August 2018

An independent stainless steel stockist approached us to fabricate a bespoke section made from tube and bends. They supplied the drawings and dimensions and left the rest to us. All of the welds were cleaned and finished to a hygienic standard. The project was time critical and we managed to beat the deadline by two days.